So thought i would give this a go changing leads and plugs on my 98' au wagon, hopefully i chose the right leads installing top gun max leads and NGK plugs.
diffinatley needed doing as i started to remove leads from the plugs and they crumbled,

.
Long nose pliers came in real handy.

Managed to get to the coil easy from the top after removing air intake, changed 1 by 1 with a few minor burns top gun lead numbering system helped.
Thanks for the picture run through looks harder than it is.
Took all of 25mins to do!!!
Need to get sum info on cams and what i can do to a straight 6 by myself so if there is any info that would help it would be much appreciated.
cheers.